Transcription[]
TRAVEL ENCOUNTERS
UNDERGROUND OPERATIONS
UNDERGROUND TRANSPORT CABLE CAR GREAT MINE[]
To survive the Eternal Freeze, people dug deep into the underground of Belobog, excavating and transporting Geomarrow to the surface for energy and goods. As the excavation continued for hundreds of years, a huge hole was created under the earth. People settled in various mining towns as they mined generation after generation.
The Overworld and Underworld worked closely, exchanging ore and supplies using the cable car. This exchange was eventually disrupted by the Supreme Guardian's blockade order, and now the transport lines have come to a complete halt.
AUTOMATON PATROL ROBOT SETTLEMENT[]
To assist Underground miners with heavy labor and geological work, the Architects dispatched a large number of automatons below, from the smallest Beetle class robots to the intelligent Svarog. These robots are responsible for assistance, maintenance, and production, while also offering some protection to the miners.
As time passed, the Underground miners became used to living alongside the robots. As the Fragmentum became more aggressive and the corrosion spread deeper, the Silvermane Guards were withdrawn from the Underground, leaving the icy machines as the last line of defense to protect the people of the Underground.
Gallery[]
Other Languages[]
| Language | Official Name |
|---|---|
| English | Travel Encounters | Underground Operations |
| Chinese (Traditional) | 旅情見聞 | 地底的運作 |
| Japanese | 【旅情見聞 | 地下の機能】 |
| Korean | 여행 견문 | 지하의 운영 |
| Spanish | Noticias del viaje | Operaciones del Bajomundo |
| Russian | Встречи в путешествиях | Подземные работы |
| Thai | ความรู้จากการเดินทาง | ปฏิบัติการในเมืองด้านล่าง |
| Vietnamese | Kiến Thức Du Hành | Hoạt Động Dưới Lòng Đất |
| Indonesian | Penemuan di Perjalanan | Operasi Bawah Tanah |
